Daewoo ST Series Instruções de Operação Página 84

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 83
6.3. Engine Re-assembly
6.3.1. General precautions
Clean all the disassembled parts, particularly oil and water ports, using compressed air,
then check that they are free from restrictions.I
Arrange the general and special tools in order to engine assembly operation.
To lubricate each sliding part, prepare the clean engine oil.
Prepare maintenance materials such as sealant, gaskets, and etc.
Discard used gaskets, seal rings, and consumable parts, and replace with new ones.
Apply only the specified torque for bolts in the specified tightening order and avoid over-
tightening.
Be sure to check that all the engine parts operate smoothly after being reassembled.
Check the bolts for looseness after preliminary re-assembly.
After completing the engine re-assembly operation, check if there is missing parts or short-
age of parts.
Keep your hands clean during the maintenance.
6.3.2. Cylinder block
Cover the floor of the workshop with wood plate or thick paper to prevent damage to the
cylinder head and place the head face of the cylinder block towards downward.
6.3.3. Oil spray nozzle
Tighten and assemble the oil spray
nozzle with fixing bolts using the
spray nozzle jig.
6.3.4. Tappet and cam shaft
Under cool a new bush with dry ice for about 2 hours and press it into position in the cylin-
der block using a bench press. After the pressing operation, measure the inside diameter of
the cam bush to check if it is not deformed.
- 81 -
EDM3053I
Vista de página 83
1 2 ... 79 80 81 82 83 84 85 86 87 88 89 ... 182 183

Comentários a estes Manuais

Sem comentários