Daewoo ST Series Instruções de Operação Página 20

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 19
3.3.1. Initial two hours of break-in
For the first five to ten minutes of operation, operate engine at a fast idle (below 1,500 rpm).
During the remaining first two hours of operation, accelerate to bring boat onto plane quickly and
bring throttle back to maintain a planing attitude. During this period, vary the engine speed
frequently by accelerating to approximately three-fourths throttle (1700 ~ 1800 rpm) for two to
three minutes, then back to minimum planing speed (700 ~ 750 rpm).
After the engine has reached operating temperature, momentarily reduce engine speed, then
increase engine speed, to assist the break-in of rings and bearings. Maintain planing boat attitude
to avoid excessive engine load.
Note : Do not run engine at any constant rpm for prolonged periods of time for this initial
two hours of break-in.
3.3.2. Next 8 Hours
During the next 8 hours, continue to operate at approximately three-fourths throttle or less
(Minimum planning speed). Occasionally reduce throttle to idle speed for a cooling period. During
this 8 hours of operation, it is permissible to operate at full throttle for periods of less than two
minutes only 2 times.
Note : Do not run engine at a constant rpm for prolonged periods of time during the break-
in period.
- 17 -
Vista de página 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 182 183

Comentários a estes Manuais

Sem comentários